Harvard University- Weld Hall
Boston, MA
Sciences Building
35,000 SF
A “Hybrid” Geothermal HVAC system was designed for Arnold Arboretum Research and Administration building totaling 35,000 SF and having a 240-ton heating and cooling load.
Features: “HYBRID” Geothermal Closed Loop HVAC System