top of page

Harvard University- Weld Hall

Boston, MA

Sciences Building

35,000 SF

 

A “Hybrid” Geothermal HVAC system was designed for Arnold Arboretum Research and Administration building totaling 35,000 SF and having a 240-ton heating and cooling load. 

 

Features: “HYBRID” Geothermal Closed Loop HVAC System

bottom of page